Country | Argentina (Argentine Republic) |
Facility Name | RA-1 ENRICO FERMI REACTOR |
Facility Number | AR-0001 |
Status | OPERATIONAL |
Last Updated | 2010/02/08 |
General Data |
Owner | COMICION NACIONAL DE ENERGIA ATOMICA |
Operator | COMICION NACIONAL DE ENERGIA ATOMICA |
Licensing | ARN Autoridad Regulatoria Nuclear NUCLEAR |
Construction Date | 1957/04/01 |
Criticality Date | 1958/01/20 |
Safeguards | IAEA |
Initial Cost | |
Annual Cost | 0.2 M US$ |
Total Staff | 10 |
No of Operators | 8 |
Technical Data |
Reactor Type | TANK |
Thermal Power, Steady (kW) | 40.00 |
Max Flux SS, Thermal (n/cm2-s) | 1.5E12 |
Max Flux SS, Fast (n/cm2-s) | 1.0E12 |
Thermal Power, Pulsed (MW) | 0.00 |
Max Flux Pulsed, Thermal (n/cm2-s) | |
Max Flux Pulsed, Fast (n/cm2-s) | |
Moderator | LIGHT WATER |
Coolant | LIGHT WATER |
Natural Convection Cooling | |
Forced Cooling | YES |
Coolant Velocity in Core | 6.44 CM/S |
Reflector | GRAPHITE |
Reflector Number of Sides | 8 |
Control Rods Material | CD |
Control Rods number | 4 |
Experimental Facilities |
Horizontal Channels | 2 |
Horizontal Max Flux (n/cm2-s) | 6.0E11 EPITHERMAL |
Horizontal Use | DOSIMETRY, NEUTRON ACTIVATION ANALYSIS |
Vertical Channels | 1 |
Vertical Max Flux (n/cm2-s) | 2.0E12 |
Vertical Use | NEUTRON ACTIVATION ANALYSIS |
Core Irradiation Facilities | 2 |
Core Max Flux (n/cm2-s) | 1.0E12 FAST |
Reflector Irradiation Facilities | 8 |
Loops Number | 2 |
Loops Max Flux | 1.0E12 FAST |
Loops use | IRRADIATION DAMAGE STUDIES |
Fuel data |
Origin of Fissile Material | USA |
Enrichment Supplier | USA |
Equilibrium Core Size | 228 |
Plates per Element | |
Dimensions of Plates | |
Rods per Element | |
Dimensions of Rods, mm | |
Tubes per Element | 1 |
Dimensions of Tubes, mm | 660 X 9.7 |
Cladding Material | AL ALLOY |
Cladding Thickness, mm | 1.0 |
Fuel Material | |
Fuel Thickness, mm | 7.6 |
Uranium Density, g/cm3 | 0.55 |
Burnup on Discharge, max % | |
Burnup Average, % | |
Last Shipment Year | |
Last Receipt Year | |
Fuel Fabricator | CNEA, ARGENTINA |
Utilization |
Hours per Day | 24 |
Days per Week | 7 |
Weeks per Year | 25 |
MW Days per Year | 0 |
Materials/fuel test experiments | NO |
Isotope Production | NO |
Neutron Scattering | NO |
Neutron Radiography | NO |
Neutron capture therapy | Patients irradiated: N/A |
Activation Analysis | N/A |
20 | |
Transmutation | NO |
Geochronology | NO |
Teaching | Number of students: 40 |
Training | Number of operators/experimenters trained: 10 |
Other Uses | NO |
Operating Experience |
Reactor | Thermal Power | Date of | Operational for | |||
Category | Type | kW | Criticality | Construction | Years | Months |
RESEARCH | TANK | 40.00 | 1958/01/20 | 1957/04/01 | 52 | 1 |