Research Reactor Details - RA-1 ENRICO FERMI REACTOR


Country Argentina (Argentine Republic)
Facility Name RA-1 ENRICO FERMI REACTOR
Facility Number AR-0001
Status OPERATIONAL
Last Updated 2010/02/08


General Data
Owner  COMICION NACIONAL DE ENERGIA ATOMICA
Operator  COMICION NACIONAL DE ENERGIA ATOMICA
Licensing  ARN Autoridad Regulatoria Nuclear NUCLEAR
Construction Date  1957/04/01
Criticality Date  1958/01/20
Safeguards  IAEA
Initial Cost
Annual Cost 0.2 M US$
Total Staff 10
No of Operators 8


Technical Data
Reactor Type TANK
Thermal Power, Steady (kW) 40.00
Max Flux SS, Thermal (n/cm2-s) 1.5E12
Max Flux SS, Fast (n/cm2-s) 1.0E12
Thermal Power, Pulsed (MW) 0.00
Max Flux Pulsed, Thermal (n/cm2-s)
Max Flux Pulsed, Fast (n/cm2-s)
Moderator LIGHT WATER
Coolant LIGHT WATER
Natural Convection Cooling
Forced Cooling YES
Coolant Velocity in Core 6.44 CM/S
Reflector GRAPHITE
Reflector Number of Sides 8
Control Rods Material CD
Control Rods number 4


Experimental Facilities
Horizontal Channels 2
Horizontal Max Flux (n/cm2-s) 6.0E11 EPITHERMAL
Horizontal Use DOSIMETRY, NEUTRON ACTIVATION ANALYSIS
Vertical Channels 1
Vertical Max Flux (n/cm2-s) 2.0E12
Vertical Use NEUTRON ACTIVATION ANALYSIS
Core Irradiation Facilities 2
Core Max Flux (n/cm2-s) 1.0E12 FAST
Reflector Irradiation Facilities 8
Loops Number 2
Loops Max Flux 1.0E12 FAST
Loops use IRRADIATION DAMAGE STUDIES


Fuel data
Origin of Fissile Material USA
Enrichment Supplier USA
Equilibrium Core Size 228
Plates per Element
Dimensions of Plates
Rods per Element
Dimensions of Rods, mm
Tubes per Element 1
Dimensions of Tubes, mm 660 X 9.7
Cladding Material AL ALLOY
Cladding Thickness, mm 1.0
Fuel Material
Fuel Thickness, mm 7.6
Uranium Density, g/cm3 0.55
Burnup on Discharge, max %
Burnup Average, %
Last Shipment Year
Last Receipt Year
Fuel Fabricator CNEA, ARGENTINA


Utilization
Hours per Day  24
Days per Week  7
Weeks per Year  25
MW Days per Year  0
Materials/fuel test experiments  NO
Isotope Production  NO
Neutron Scattering  NO
Neutron Radiography  NO
Neutron capture therapy  Patients irradiated: N/A
Activation Analysis  N/A
  • number of samples irradiated
  •  20
    Transmutation  NO  
    Geochronology  NO
    Teaching  Number of students: 40
    Training  Number of operators/experimenters trained: 10
    Other Uses  NO


    Operating Experience
    Reactor Thermal Power Date of Operational for
    Category Type kW Criticality Construction Years Months
     RESEARCH  TANK  40.00  1958/01/20  1957/04/01  52  1