Research Reactor Details - SLOWPOKE-2, MONTREAL


Country Canada
Facility Name SLOWPOKE-2, MONTREAL
Facility Number CA-0009
Status OPERATIONAL
Last Updated 2009/02/03


General Data
Owner  ECOLE POLYTECHNIQUE DE MONTREAL
Operator  
Licensing  CANADIAN NUCLEAR SAFETY COMMISSION
Construction Date  1975/01/01
Criticality Date  1976/05/01
Safeguards  IAEA
Initial Cost 220 K C$
Annual Cost 500 K C$
Total Staff 5
No of Operators 4


Technical Data
Reactor Type SLOWPOKE-2
Thermal Power, Steady (kW) 20.00
Max Flux SS, Thermal (n/cm2-s) 1.0E12
Max Flux SS, Fast (n/cm2-s) 2.5E11
Thermal Power, Pulsed (MW) 0.00
Max Flux Pulsed, Thermal (n/cm2-s)
Max Flux Pulsed, Fast (n/cm2-s)
Moderator LIGHT WATER
Coolant LIGHT WATER
Natural Convection Cooling YES
Forced Cooling
Coolant Velocity in Core
Reflector BE,H2O
Reflector Number of Sides ANNULAR+TOP+BOTTOM
Control Rods Material CD
Control Rods number 1


Experimental Facilities
Horizontal Channels
Horizontal Max Flux (n/cm2-s)
Horizontal Use
Vertical Channels
Vertical Max Flux (n/cm2-s)
Vertical Use
Core Irradiation Facilities
Core Max Flux (n/cm2-s)
Reflector Irradiation Facilities 7
Loops Number
Loops Max Flux
Loops use


Fuel data
Origin of Fissile Material USA
Enrichment Supplier USA (ERDA)
Equilibrium Core Size 1
Plates per Element
Dimensions of Plates
Rods per Element
Dimensions of Rods, mm 5.26 X 234
Tubes per Element
Dimensions of Tubes, mm
Cladding Material ZR
Cladding Thickness, mm 0.51
Fuel Material UO2
Fuel Thickness, mm 4.16 DIA
Uranium Density, g/cm3 10.6 OXIDE
Burnup on Discharge, max % 1.3
Burnup Average, % 1.3
Last Shipment Year
Last Receipt Year
Fuel Fabricator ZIRCATEC


Utilization
Hours per Day  6
Days per Week  5
Weeks per Year  50
MW Days per Year  0
Materials/fuel test experiments  NO
Isotope Production  41Ar, 198Au, 24Na, 46Sc, 233Pa
  • Total Activity (GBq)
  •  1
    Neutron Scattering  NO
    Neutron Radiography  NO
    Neutron capture therapy  NO
    Activation Analysis  INAA
  • number of samples irradiated
  •  10500
    Transmutation  NO  
    Geochronology  NO
    Teaching  Number of students: N/A
    Training  NO
    Other Uses  NO


    Operating Experience
    Reactor Thermal Power Date of Operational for
    Category Type kW Criticality Construction Years Months
     RESEARCH  SLOWPOKE-2  20.00  1976/05/01  1975/01/01  33  0