Country | Chile, Republic of |
Facility Name | RECH-2 |
Facility Number | CL-0002 |
Status | TEMPORARY SHUTDOWN |
Last Updated | 2009/05/10 |
General Data |
Owner | COMISION CHILENA DE ENERGIA NUCLEARES |
Operator | LO AGUIRRE NUCLEAR CENTER-CCHEN |
Licensing | COMISION CHILENA DE ENERGIA NUCLEAR (CCHEN) |
Construction Date | 1972/12/01 |
Criticality Date | 1989/09/06 |
Safeguards | IAEA |
Initial Cost | 13 M US$ |
Annual Cost | 34 k US$ |
Total Staff | 5 |
No of Operators | 1 |
Technical Data |
Reactor Type | POOL |
Thermal Power, Steady (kW) | 2,000.00 |
Max Flux SS, Thermal (n/cm2-s) | 1.0E13 |
Max Flux SS, Fast (n/cm2-s) | 1.0E13 |
Thermal Power, Pulsed (MW) | 0.00 |
Max Flux Pulsed, Thermal (n/cm2-s) | |
Max Flux Pulsed, Fast (n/cm2-s) | |
Moderator | LIGHT WATER |
Coolant | LIGHT WATER |
Natural Convection Cooling | YES |
Forced Cooling | >20kW |
Coolant Velocity in Core | 2.72 M/S |
Reflector | GRAPHITE |
Reflector Number of Sides | 4 |
Control Rods Material | BORAL |
Control Rods number | 5 |