Country | Japan |
Facility Name | JRR-3M |
Facility Number | JP-0008 |
Status | OPERATIONAL |
Last Updated | 2002/08/30 |
General Data |
Owner | JAPAN ATOMIC ENERGY RESEARCH INSTITUTE |
Operator | TOKAI RESEARCH ESTABLISHMENT |
Licensing | MINISTRY OF EDUCATION, CULTURE, SPORTS, SCIENCE & TECHNOLOGY |
Construction Date | 1985/08/02 |
Criticality Date | 1990/03/22 |
Safeguards | IAEA |
Initial Cost | 32.5 B YEN |
Annual Cost | 1.8 B YEN |
Total Staff | 41 |
No of Operators | 25 |
Technical Data |
Reactor Type | POOL |
Thermal Power, Steady (kW) | 20,000.00 |
Max Flux SS, Thermal (n/cm2-s) | 2.7 E14 |
Max Flux SS, Fast (n/cm2-s) | 1.4E14 |
Thermal Power, Pulsed (MW) | 0.00 |
Max Flux Pulsed, Thermal (n/cm2-s) | |
Max Flux Pulsed, Fast (n/cm2-s) | |
Moderator | LIGHT WATER |
Coolant | LIGHT WATER |
Natural Convection Cooling | |
Forced Cooling | 2400 M3/HR |
Coolant Velocity in Core | 5.9 M/S |
Reflector | BE,D2O,H2O |
Reflector Number of Sides | 4 |
Control Rods Material | HF |
Control Rods number | 6 |
Experimental Facilities |
Horizontal Channels | 9 |
Horizontal Max Flux (n/cm2-s) | |
Horizontal Use | BEAM EXPERIMENTS |
Vertical Channels | 17 |
Vertical Max Flux (n/cm2-s) | 2.7E14 |
Vertical Use | MATERIAL IRRADIATION TESTS, RADIOISOTOPES PRODUCTION |
Core Irradiation Facilities | 9 |
Core Max Flux (n/cm2-s) | 2.7E14 |
Reflector Irradiation Facilities | 8 |
Loops Number | |
Loops Max Flux | |
Loops use |
Fuel data |
Origin of Fissile Material | USA |
Enrichment Supplier | USA |
Equilibrium Core Size | 26 |
Plates per Element | 21 |
Dimensions of Plates | 1.521X 71.0 X 770 |
Rods per Element | |
Dimensions of Rods, mm | |
Tubes per Element | |
Dimensions of Tubes, mm | |
Cladding Material | AL ALLOY |
Cladding Thickness, mm | 0.38 |
Fuel Material | U3O8ALX & U3SI2ALX |
Fuel Thickness, mm | 0.51 |
Uranium Density, g/cm3 | 4.8 |
Burnup on Discharge, max % | 60 |
Burnup Average, % | 30 |
Last Shipment Year | |
Last Receipt Year | 2002 |
Fuel Fabricator | CERCA, FRANCE |
Utilization |
Hours per Day | 24 |
Days per Week | 7 |
Weeks per Year | 28 |
MW Days per Year | 3300 |
Materials/fuel test experiments | Number of runs: 6 |
Isotope Production | 192 Ir, 198Au, 196Yb, 60Co |
600000 | |
Neutron Scattering | Neutron scattering |
926 | |
Neutron Radiography | On-line beam hours: 1500 |
Neutron capture therapy | NO |
Activation Analysis | PGNAA, INAA |
1500 | |
Transmutation | Mass of Silicon (kg) : 2354 Mass of gemstones (kg): N/A |
Geochronology | Fission Track |
2 | |
Teaching | NO |
Training | NO |
Other Uses | NO |
Operating Experience |
Reactor | Thermal Power | Date of | Operational for | |||
Category | Type | kW | Criticality | Construction | Years | Months |
RESEARCH | POOL | 20000.00 | 1990/03/22 | 1985/08/02 | 19 | 11 |