Research Reactor Details - NUCLEAR CHICAGO MOD 2000


Country Mexico (United Mexican States)
Facility Name NUCLEAR CHICAGO MOD 2000
Facility Number MX-0004
Status OPERATIONAL
Last Updated 2010/03/23


General Data
Owner  INST POLYTECHNICO NACIONAL
Operator  INST POLYTECHNICO NACIONAL
Licensing  COMISION NACIONAL DE SEGURIDAD NUCLEAR Y SALVAGUARDIAS
Construction Date  1968/01/01
Criticality Date  1969/01/01
Safeguards  
Initial Cost
Total Staff 3
No of Operators 3


Technical Data
Reactor Type SUBCRIT
Thermal Power, Steady (kW) 0.00
Max Flux SS, Thermal (n/cm2-s) 3.18E04
Max Flux SS, Fast (n/cm2-s) 1.15E05
Thermal Power, Pulsed (MW) 0.00
Max Flux Pulsed, Thermal (n/cm2-s)
Max Flux Pulsed, Fast (n/cm2-s)
Moderator LIGHT WATER
Coolant
Natural Convection Cooling
Forced Cooling
Coolant Velocity in Core
Reflector H2O
Reflector Number of Sides
Control Rods Material
Control Rods number


Experimental Facilities
Horizontal Channels
Horizontal Max Flux (n/cm2-s)
Horizontal Use
Vertical Channels 2
Vertical Max Flux (n/cm2-s)
Vertical Use STUDENT TRAINING, EXPERIMENTS
Core Irradiation Facilities
Core Max Flux (n/cm2-s)
Reflector Irradiation Facilities
Loops Number
Loops Max Flux
Loops use


Fuel data
Origin of Fissile Material USA
Enrichment Supplier USA
Equilibrium Core Size
Plates per Element
Dimensions of Plates
Rods per Element
Dimensions of Rods, mm
Tubes per Element
Dimensions of Tubes, mm
Cladding Material AL ALLOY
Cladding Thickness, mm
Fuel Material
Fuel Thickness, mm
Uranium Density, g/cm3
Burnup on Discharge, max %
Burnup Average, %
Last Shipment Year
Last Receipt Year
Fuel Fabricator NUCLEAR CHICAGO, USA


Utilization
Hours per Day  3
Days per Week  5
Weeks per Year  46
MW Days per Year  0
Materials/fuel test experiments  NO
Isotope Production  NO
Neutron Scattering  NO
Neutron Radiography  NO
Neutron capture therapy  NO
Activation Analysis  NO
Transmutation  NO  
Geochronology  NO
Teaching  Number of students: 7
Training  Number of operators/experimenters trained: 3
Other Uses  NO


Operating Experience
Reactor Thermal Power Date of Operational for
Category Type kW Criticality Construction Years Months
 TRAINING  SUBCRIT  0.00  1969/01/01  1968/01/01  41  5