Research Reactor Details - RP-10


Country Peru, Republic of
Facility Name RP-10
Facility Number PE-0002
Status OPERATIONAL
Last Updated 2009/02/27


General Data
Owner  INSTITUTO PERUANO DE ENERGIA NUCLEAR
Operator  INSTITUTO PERUANO DE ENERGIA NUCLEAR
Licensing  NATIONAL AUTHORITY
Construction Date  1980/10/10
Criticality Date  1988/11/30
Safeguards  IAEA
Initial Cost 100 M $
Total Staff 25
No of Operators 8


Technical Data
Reactor Type POOL
Thermal Power, Steady (kW) 10,000.00
Max Flux SS, Thermal (n/cm2-s) 1.21E14
Max Flux SS, Fast (n/cm2-s) 1.0E14
Thermal Power, Pulsed (MW) 0.00
Max Flux Pulsed, Thermal (n/cm2-s)
Max Flux Pulsed, Fast (n/cm2-s)
Moderator LIGHT WATER
Coolant LIGHT WATER
Natural Convection Cooling 400kW max.
Forced Cooling 1650 M3/H
Coolant Velocity in Core 3.4 M/S
Reflector BE,GRAPHITE
Reflector Number of Sides 4
Control Rods Material AG,IN,CD
Control Rods number 6


Experimental Facilities
Horizontal Channels 6
Horizontal Max Flux (n/cm2-s) 1.0E13
Horizontal Use NEUTRON RADIOGRAPHY, PROMPT GAMMA
Vertical Channels 6
Vertical Max Flux (n/cm2-s) 1.4E14
Vertical Use Isotope production, NEUTRON ACTIVATION ANALYSIS
Core Irradiation Facilities 6
Core Max Flux (n/cm2-s) 1.4E14
Reflector Irradiation Facilities 1
Loops Number
Loops Max Flux
Loops use


Fuel data
Origin of Fissile Material USA
Enrichment Supplier USA
Equilibrium Core Size 27, INCLUDING 5 CONTROL FUEL ELEMENTS
Plates per Element 16, 12
Dimensions of Plates 665 X 70.75 X 1.76
Rods per Element
Dimensions of Rods, mm
Tubes per Element
Dimensions of Tubes, mm
Cladding Material AL ALLOY
Cladding Thickness, mm 0.38
Fuel Material U3O8
Fuel Thickness, mm 1
Uranium Density, g/cm3 23
Burnup on Discharge, max % 58.6
Burnup Average, % 55.3
Last Shipment Year
Last Receipt Year
Fuel Fabricator NUKEM, GERMANY


Utilization
Hours per Day  6
Days per Week  3
Weeks per Year  52
MW Days per Year  156
Materials/fuel test experiments  NO
Isotope Production  131I, 99Tc, 32P, 153Sm, 192Ir
  • Total Activity (GBq)
  •  N/A
    Neutron Scattering  Neutron diffraction
  • On-line beam hours
  •  N/A
    Neutron Radiography  On-line beam hours: N/A
    Neutron capture therapy  NO
    Activation Analysis  INAA, RNAA
  • number of samples irradiated
  •  N/A
    Transmutation  NO  
    Geochronology  Fission track
  • number of samples irradiated
  •  N/A
    Teaching  Number of students: 50
    Training  Number of operators/experimenters trained: 10
    Other Uses  NO


    Operating Experience
    Reactor Thermal Power Date of Operational for
    Category Type kW Criticality Construction Years Months
     RESEARCH  POOL  10000.00  1988/11/30  1980/10/10  21  6