Country | Peru, Republic of |
Facility Name | RP-10 |
Facility Number | PE-0002 |
Status | OPERATIONAL |
Last Updated | 2009/02/27 |
General Data |
Owner | INSTITUTO PERUANO DE ENERGIA NUCLEAR |
Operator | INSTITUTO PERUANO DE ENERGIA NUCLEAR |
Licensing | NATIONAL AUTHORITY |
Construction Date | 1980/10/10 |
Criticality Date | 1988/11/30 |
Safeguards | IAEA |
Initial Cost | 100 M $ |
Total Staff | 25 |
No of Operators | 8 |
Technical Data |
Reactor Type | POOL |
Thermal Power, Steady (kW) | 10,000.00 |
Max Flux SS, Thermal (n/cm2-s) | 1.21E14 |
Max Flux SS, Fast (n/cm2-s) | 1.0E14 |
Thermal Power, Pulsed (MW) | 0.00 |
Max Flux Pulsed, Thermal (n/cm2-s) | |
Max Flux Pulsed, Fast (n/cm2-s) | |
Moderator | LIGHT WATER |
Coolant | LIGHT WATER |
Natural Convection Cooling | 400kW max. |
Forced Cooling | 1650 M3/H |
Coolant Velocity in Core | 3.4 M/S |
Reflector | BE,GRAPHITE |
Reflector Number of Sides | 4 |
Control Rods Material | AG,IN,CD |
Control Rods number | 6 |
Experimental Facilities |
Horizontal Channels | 6 |
Horizontal Max Flux (n/cm2-s) | 1.0E13 |
Horizontal Use | NEUTRON RADIOGRAPHY, PROMPT GAMMA |
Vertical Channels | 6 |
Vertical Max Flux (n/cm2-s) | 1.4E14 |
Vertical Use | Isotope production, NEUTRON ACTIVATION ANALYSIS |
Core Irradiation Facilities | 6 |
Core Max Flux (n/cm2-s) | 1.4E14 |
Reflector Irradiation Facilities | 1 |
Loops Number | |
Loops Max Flux | |
Loops use |
Fuel data |
Origin of Fissile Material | USA |
Enrichment Supplier | USA |
Equilibrium Core Size | 27, INCLUDING 5 CONTROL FUEL ELEMENTS |
Plates per Element | 16, 12 |
Dimensions of Plates | 665 X 70.75 X 1.76 |
Rods per Element | |
Dimensions of Rods, mm | |
Tubes per Element | |
Dimensions of Tubes, mm | |
Cladding Material | AL ALLOY |
Cladding Thickness, mm | 0.38 |
Fuel Material | U3O8 |
Fuel Thickness, mm | 1 |
Uranium Density, g/cm3 | 23 |
Burnup on Discharge, max % | 58.6 |
Burnup Average, % | 55.3 |
Last Shipment Year | |
Last Receipt Year | |
Fuel Fabricator | NUKEM, GERMANY |
Utilization |
Hours per Day | 6 |
Days per Week | 3 |
Weeks per Year | 52 |
MW Days per Year | 156 |
Materials/fuel test experiments | NO |
Isotope Production | 131I, 99Tc, 32P, 153Sm, 192Ir |
N/A | |
Neutron Scattering | Neutron diffraction |
N/A | |
Neutron Radiography | On-line beam hours: N/A |
Neutron capture therapy | NO |
Activation Analysis | INAA, RNAA |
N/A | |
Transmutation | NO |
Geochronology | Fission track |
N/A | |
Teaching | Number of students: 50 |
Training | Number of operators/experimenters trained: 10 |
Other Uses | NO |
Operating Experience |
Reactor | Thermal Power | Date of | Operational for | |||
Category | Type | kW | Criticality | Construction | Years | Months |
RESEARCH | POOL | 10000.00 | 1988/11/30 | 1980/10/10 | 21 | 6 |